September 17, 2021
11 11 11 AM
California homeless camp fire damages 2 bridges, disrupts public transportation
Austin finishes half of its bicycle network, expects to complete entire 400-mile system by 2025
The Top 10 Automotive Concepts that automotive enthusiasts will be itching to see on the road!
Oregon Transportation Commission, wary of I-5 Rose Quarter project’s growing price tag, grants conditional approval
Woman dies after being hit by car in North Windham Friday night
Silk-FAW Continues To Poach Italy’s Automotive Talent, As Lamborghini’s Katia Bassi Joins As Managing Director
Transportation Department cracks down on airlines withholding refunds for canceled flights
Bear gets trapped in car, destroys interior
Cycling apparel company adding full-service bike repair to visitor center
German sales plunge in August to lowest level since 1992
Latest Post
California homeless camp fire damages 2 bridges, disrupts public transportation Austin finishes half of its bicycle network, expects to complete entire 400-mile system by 2025 The Top 10 Automotive Concepts that automotive enthusiasts will be itching to see on the road! Oregon Transportation Commission, wary of I-5 Rose Quarter project’s growing price tag, grants conditional approval Woman dies after being hit by car in North Windham Friday night Silk-FAW Continues To Poach Italy’s Automotive Talent, As Lamborghini’s Katia Bassi Joins As Managing Director Transportation Department cracks down on airlines withholding refunds for canceled flights Bear gets trapped in car, destroys interior Cycling apparel company adding full-service bike repair to visitor center German sales plunge in August to lowest level since 1992
Apr
2020
8

China Bicycle Water Bottle Holder

Bicycle Water Bottle Holder

1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

 

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc….

Fast mould design

We can be within 1-3 working days after getting customer’s drawings.

Lead time

Plastic moulds: 2- 7 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available.

Minimum order

Small orders can be accepted.

Production capacity

45-50 sets/month.

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner, sub gate/edge gate /cow horn gate…etc

Payment terms

L/C T/T Western Union MoneyGram.

Mould making service

OEM/ODM service is available.

After-sales service

Life-long gurantee.

Safe packing

In strong wooden pallets to avoid any damages during long transportation.

Bicycle Water Bottle Holder
Bicycle Water Bottle Holder
Bicycle Water Bottle Holder
Bicycle Water Bottle Holder
Bicycle Water Bottle Holder
Bicycle Water Bottle Holder
Bicycle Water Bottle Holder

Bicycle Water Bottle Holder
 

Source Article